Step 1 — Confirm the substrate is press-ready
- Corona-treat coated board, BOPP, PET, and metallized film to ≥ 42 dyne/cm — verify with dyne pens each shift.
- Run substrate within 24 h of corona treatment; treatment decays 2–3 dyne/cm per day on film.
- Wipe silicone-release or waxy substrates with IPA on trial sheets to isolate contamination.
- Keep humidity in the pressroom between 45–55% to avoid static and paper curl.